Understanding the requirement, site inspection, plan for chiller system deployment and consultancy.
2. Platform Construction
3,000 sq. ft platform design and construction was carried out in the second phase.
Project Facts
July 2016
Project Started
5,000 sq ft
Area covered in 30 floors
6 HVAC Chillers
Backed by 3600 KVA generators
3 months
Project life
3. Equipment Installation
After the construction, testing of platform, the equipment which included 4 HVAC chillers and 4 3600 KVA generators were delivered to the site, installed and tested.
4. Testing & Handover
After QA and testing, the chilling plant was handover to the site engineers.